Skip to content
  • 0 Votes
    1 Posts
    11 Views
    K
    电竞迷11月中旬可以留意古晋砂拉越体育村:砂拉越电竞博览会SAREX26定于11月13日至15日举行,赛事总奖金为5万令吉。 《婆罗洲邮报》报道,主办方目标吸引800名参赛者,目前已有600人报名;800人仍是目标,并非最终参赛人数。 比赛分为六个组别,涵盖PUBG Mobile、Mobile Legends: Bang Bang男子及女子组、赛车模拟、Tekken 8和eFootball。现场除了比赛,也安排展览、论坛及餐饮摊位。 对想了解赛事幕后运作的人来说,活动还计划举办一场目标100人参与的工作坊,内容包括比赛管理、技术需求、转播和活动筹办。报道未列明入场安排或报名截止日期,有意参加者可先向主办方确认最新详情。
  • SAREX26 esports expo targets 800 competitors

    News 📰 sarawak esports gaming
    1
    0 Votes
    1 Posts
    15 Views
    K
    Sarawak eSports Expo 2026 is set to bring six competition categories to the Sarawak Sports Village in Kuching from Nov 13 to 15, with RM50,000 in total prize money. The Borneo Post reported that 600 participants had already registered, while organisers are aiming for 800. That target is not the final number of entrants. The programme covers PUBG Mobile, men's and women's Mobile Legends: Bang Bang, racing simulation, Tekken 8 and eFootball. Beyond the tournaments, the three-day expo is expected to include exhibitions, forums and food and beverage kiosks. A workshop aimed at 100 participants will cover the practical side of staging esports events, from technical requirements and competition administration to broadcasting. The report did not specify admission arrangements or registration deadlines, so prospective visitors and players will need to check the organisers' latest details before making plans.
  • 0 Votes
    1 Posts
    10 Views
    K
    古晋拟建家具工业园,目前仍在规划阶段;砂副总理Awang Tengah Ali Hasan说,已有15家公司表达投资兴趣。 《砂拉越论坛报》报道,这项获第13大马计划批准的项目,旨在推动高附加值的木材下游制造业。不过,公司表达兴趣并不等于已落实投资或开始营运。 Awang Tengah指出,砂木材业面对全球市场不确定、经营成本上升,以及环境合规要求日趋严格等挑战。他认为业者需要提高生产力,并发展价值较高的家具与工程木材产品。 报道没有交代工业园的具体地点或开放日期,项目目前也尚未实施。 副总理是在砂木材工业发展机构的退休人员表扬及卓越服务颁奖活动上谈及此事。他呼吁业者采用适当技术,提升生产效率与市场竞争力。
  • 0 Votes
    1 Posts
    10 Views
    K
    Fifteen companies have expressed interest in a proposed furniture industrial park in Kuching, but the project has not yet been implemented, Deputy Premier Awang Tengah Ali Hasan says. Sarawak Tribune reported that the project was approved under the 13th Malaysia Plan and is intended to support higher-value downstream timber manufacturing. The expressions of interest do not mean the companies have started operations or committed completed investments. Awang Tengah said timber businesses face rising operating costs, uncertain global markets and stricter environmental requirements. The report did not give an opening date or a specific site for the proposed park.
  • 0 Votes
    1 Posts
    10 Views
    K
    古晋北市局(DBKU)表示,关键商业执照的审批时间已从150天缩短至32小时,这项改革获得全国白金奖。 DayakDaily报道,北市局另一项单一通道(Single Crossing)准证改革,也将审批流程从14天缩短至16小时,并获颁金奖。颁奖是在10月28日至29日于雪兰莪举行的全国减少官僚繁文缛节改革会议上进行。 上述数字只针对北市局提及的两项流程,不能视为所有执照和准证都可在相同时间获批。报道没有列出适用条件,也没有说明每宗申请是否都能达到有关时限;申请人仍须向北市局确认具体要求。 根据北市局的说明,两项奖项由马来西亚生产力机构颁发,表扬简化程序和加快审批的工作。北市局表示将继续改善公共服务。
  • 0 Votes
    1 Posts
    10 Views
    K
    Kuching North City Hall says it has reduced the approval period for critical business licences from 150 days to 32 hours, an initiative recognised with a national Platinum award. DayakDaily reported that DBKU also received a Gold award for cutting the approval process for Single Crossing permits from 14 days to 16 hours. The recognition came at the National Conference on Bureaucratic Red Tape Reform in Selangor on October 28 and 29. The figures refer to the specific processes identified by DBKU, not every licence or permit it handles. The report did not specify eligibility conditions or whether the stated times apply to every application.
  • 0 Votes
    1 Posts
    10 Views
    K
    从泛婆罗洲大道路口通往斯里阿曼的道路,计划建设约9公里双车道,工程获批准拨款3亿3400万令吉。 砂总理阿邦佐哈里(Abang Johari Tun Openg)10月31日在斯里阿曼表示,现有入城道路较窄,随着车流增加已日显不足。DayakDaily报道,他预计工程需时三至四年,目标在2030年建成改善后的道路网络。 报道没有交代工程开工日期,驾驶人士目前仍须使用现有路线。总理也指出,砂政府目前处于看守状态,不能批准新项目;有关道路应视为已公布的计划,而非已经完工的设施。 根据报道,这条新双车道将与其他交通项目相配合,包括Batang Lupar二桥、Lingga大桥及第二干道,改善斯里阿曼与周边地区的连接。各工程的进度和启用时间仍须分别确认。
  • 0 Votes
    1 Posts
    10 Views
    K
    A roughly 9km dual carriageway is planned between the Pan Borneo Highway junction and Sri Aman, with RM334 million approved for the project, according to Premier Abang Johari Tun Openg. DayakDaily reported that the existing road into town is narrow for growing traffic. The Premier said construction was expected to take three to four years, with the improved network targeted for 2030. He was speaking in Sri Aman on October 31. The project remains planned rather than completed, and the report did not state a construction start date. The Premier also noted that the state government is currently in a caretaker capacity and cannot approve new projects.
  • 0 Votes
    1 Posts
    10 Views
    K
    古晋足总周六在柏特拉再也Padang SPPS以4比2击败西连足总,两回合合计8比2,闯入砂拉越超级杯决赛。 TVS报道,古晋队将在决赛对垒三马拉汉足总,但比赛日期尚待敲定。球队首回合在Kompleks Sukan Balai Ringin以4比0取胜,次回合由Mohammad Shafitri Salim梅开二度。 古晋队教练Mohammad Dzulazlan Ibrahim表示,球队会继续训练以保持状态。古晋此前在复赛以两回合9比1淘汰美里足总。 据TVS报道,古晋队在次回合上半场以3比1领先,下半场再添一球;西连队在补时阶段追回一球。最终赛程仍须等候确定,球迷目前不应把决赛日期视为已经公布。
  • 0 Votes
    1 Posts
    10 Views
    K
    Kuching FA will face Samarahan FA in the Sarawak Premier Cup final after beating Serian FA 4–2 at Padang SPPS Petra Jaya on Saturday. The result completed an 8–2 aggregate semi-final victory, following Kuching's 4–0 first-leg win at Kompleks Sukan Balai Ringin. TVS reported that Mohammad Shafitri Salim scored twice in the return match. Coach Mohammad Dzulazlan Ibrahim told TVS his side would keep training while the date of the final is being settled. Kuching had previously eliminated Miri FA 9–1 on aggregate in the quarter-finals.
  • 0 Votes
    1 Posts
    12 Views
    K
    砂拉越正拟定2026至2030年老龄化蓝图,研究范围涵盖城市、乡区及偏远地区长者的需要,也包括家属照护所面对的挑战。 《砂拉越论坛报》报道,这项工作以与砂拉越斯威本科技大学及砂拉越科技大学合作的研究为基础,聚焦医疗、经济保障、长者友善环境、终身学习及权益保护五方面。 报道提到的问题包括医疗服务可及性、经济压力、公共设施不够友善,以及适应数码科技的困难。在古晋举行的一场框架工作坊上,社区及居家照护、照顾年长亲人的家属培训与支援也被提出。这些课题横跨长者本人的生活环境和家庭照护安排,不只涉及退休后的医疗需求。 蓝图仍在制定,报道没有公布具体新计划何时落实,也没有宣布新的个人津贴或申请程序。
  • 0 Votes
    1 Posts
    13 Views
    K
    Sarawak is developing a 2026–2030 ageing blueprint informed by a study of older people’s needs in urban, rural and remote communities. Sarawak Tribune reported that the work with Swinburne University of Technology Sarawak and University of Technology Sarawak covers health, economic security, age-friendly environments, lifelong learning, and rights and protection. The report identifies access to healthcare, financial constraints, unsuitable public facilities and difficulty adapting to digital technology among the issues being studied. Community and home care, as well as support for family caregivers, were also raised at a framework workshop in Kuching. The blueprint is still being formulated. The report did not announce a new application process, individual payment or implementation date for specific programmes.
  • 0 Votes
    1 Posts
    11 Views
    K
    Kampung Mayang Kawan路口至Kampung Muara Mongkos之间的Jalan Tebakang–Mongkos路段,已安装325盏LED路灯,工程费用为216万令吉。 《砂拉越论坛报》报道,工程也包括灯柱和七座变压器。有关路灯于10月30日举行象征性启用仪式。 报道指出,Kedup选区其他主要道路将分阶段增设路灯,但未列出具体道路和时间,因此现阶段不能把其他路段也视为已完成。为避免灯光受遮挡,相关方面也呼吁砂拉越能源公司清理路旁树木及过度生长的植被。该计划针对乡区道路夜间能见度,报道没有提供实际照明效果的测量数据。
  • 0 Votes
    1 Posts
    13 Views
    K
    A stretch of Jalan Tebakang–Mongkos between the Kampung Mayang Kawan junction and Kampung Muara Mongkos has received 325 LED streetlights under a RM2.16 million project. Sarawak Tribune reported that the work also includes poles and seven transformers. The stretch was the subject of a symbolic launch on October 30. More major roads in the Kedup constituency are to receive lighting in phases, according to the report, although no dates or further road list were given. The newspaper also reported a call for vegetation near the lights to be cleared so that it does not obstruct them.
  • 0 Votes
    1 Posts
    11 Views
    K
    砂拉越能源旗下Sesco与阿布扎比再生能源公司Masdar签署购电协议,计划在姆伦水电站水库发展400兆瓦浮动太阳能项目。 据DayakDaily引述砂总理办公室消息,设施地点位于加帛省Belaga的姆伦水库,将与现有的944兆瓦水电设施结合。报道未说明太阳能工程何时动工或竣工,不能把计划容量视为已经发电。 双方10月30日在Satria Pertiwi Complex拜会期间交换协议;交换地点与项目所在地并非同一处。 砂能源在Batang Ai已有50兆瓦浮动太阳能设施投入商业运作。另计划在当地增加120兆瓦,并在巴贡水库发展300兆瓦项目;这些是不同项目。
  • 0 Votes
    1 Posts
    11 Views
    K
    A 400-megawatt floating solar project is planned for the Murum hydroelectric reservoir in Belaga after Masdar and Syarikat Sesco Berhad signed a power purchase agreement. DayakDaily reported the agreement citing the Sarawak Premier’s Office. Sesco is a subsidiary of Sarawak Energy; the proposed panels would add solar generation at the reservoir serving the existing 944MW Murum hydroelectric plant. The agreement was exchanged during an October 30 visit at the Satria Pertiwi Complex. The project itself is at Murum in Belaga, not at the exchange venue. The report did not state a construction start or completion date. Sarawak Energy already operates a 50MW floating solar facility at Batang Ai. A further 120MW there and a 300MW installation at Bakun are planned separately; those figures should not be counted as operating capacity today.
  • 0 Votes
    1 Posts
    12 Views
    K
    AirBorneo古晋至雅加达直飞航线已开放订票,首航定于11月13日。航空公司宣布,每逢星期一、五和日各有一班往返航班。 前往雅加达苏加诺哈达国际机场的MY 396航班预定下午3时10分从古晋起飞;回程MY 397则于雅加达当地时间下午4时55分出发。 航空公司公布的单程全包票价,经济舱从399令吉起,商务舱从888令吉起,并表示机票通过其经过验证的直销渠道出售。 这次公布的首航日期、班次及票价补充了较早航线消息中未列明的资料;当时预期的开航月份是10月。实际航班与票价以订票时向航空公司确认的资料为准。
  • 0 Votes
    1 Posts
    12 Views
    K
    AirBorneo has opened bookings for its direct Kuching–Jakarta service, with the first flight scheduled for November 13 and three services a week thereafter. The airline said flights to Soekarno-Hatta International Airport will operate on Mondays, Fridays and Sundays. Flight MY 396 is scheduled to leave Kuching at 3.10pm; the return MY 397 departs Jakarta at 4.55pm local time. One-way all-in fares start at RM399 in economy and RM888 in business class. The airline says tickets are sold through its verified direct channels. The booking announcement supplies the date, frequency and fares missing from the earlier route announcement, which had indicated an October start. Travellers should check their chosen flight and fare with the airline before booking.
  • 0 Votes
    1 Posts
    10 Views
    K
    如果在美里留半天看庙宇,我会把三清殿(San Ching Tian Temple,也见Lian Hua San San Ching Temple)排成一段慢慢看的短停留,而不是拍完牌楼就上车。这里在Krokop一带的住宅区,真正值得注意的,是宽阔庭院、横向展开的主殿,以及藏在侧边的凉亭和装饰墙怎样连成一个仍有人使用的信仰空间。 [image: 1793422660709-3.jpg] Google Map / Lian Hua San Ching Tien Temple 先把地点存好再出发。我不会只拿一张“美里华人庙宇”的照片来认路:附近还有其他庙,满眼巨龙的入口未必就是三清殿。沿Jln Chong Poh找到正确庙区后,先在不挡路的位置看清主殿和庭院的关系,才决定从哪一侧慢慢走。 三清殿是一处由道教人员照料的信仰空间。看这座建筑,我在意的不是争论它在东南亚排第几,而是它并非一处已经停止变化、只供游客观看的老遗址。宗教活动和日常维护仍在这里继续,参观的步调也应该让位给正在使用庙宇的人。 我会先看屋顶,再把视线移到柱子和台阶。橙色瓦面横向铺开,屋脊的装饰向上伸出;下方盘绕的龙柱、殿前香炉和台阶,又把人的注意力带回主殿入口。若只用广角把整座庙塞进画面,很容易忽略这些装饰其实也在引导人怎样接近祭祀空间。 [image: 1793422660845-2.jpg] Google Map / Lian Hua San Ching Tien Temple 走到龙纹浮雕墙前,观看的距离可以换一换。先退后看完整块墙,再辨认交错的龙身、云纹和卷曲线条。它与屋脊上的龙不一样:一个衬着天空,一个被收进清楚的长方形构图里。对我来说,这个差别比数一数“这里有多少条龙”更有意思,也更值得多停几分钟。看细节时,记得把通道留出来。 主殿旁边则是另一种尺度。长廊的柱列、园里的植物和小凉亭,把正面开阔的感觉收了回来。我会把这里当作走累后停一下、再回望主殿的位置,不会期待另有一座大型公园可以逛。只要当天允许通行,从正面转到侧面,已经能看见建筑不同的表情。 [image: 1793422661006-5.jpg] Google Map / Lian Hua San Ching Tien Temple 2026年8月,庙方道教团体获移交40万令吉UNIFOR拨款,用于改善与维修设施。这是今天理解三清殿的另一条线索:漂亮的庙宇也需要持续照顾,不是建好以后就永远保持原样。拨款不等于每项工程已经完工,更不代表每个角落都保证开放。遇上围栏、维修告示或正在举行的仪式,就调整路线;要进殿或靠近工作区域,先问管理人员,不为找拍摄角度越过限制。 下面这张庭院照片在2026年10月发布,镜头从庙区往入口看。我喜欢这个方向,因为它提醒人不必一路只盯着主殿;回头看牌楼与庭院,空间的层次才完整。其他较早照片适合帮助辨认装饰和建筑,不要拿来要求今天的植物、漆色或通行安排一模一样。 [image: 1793422661109-latest.jpg] Google Map / Lian Hua San Ching Tien Temple · 2026年10月照片 行程上,我会先留约半小时,够不够再依现场活动与自己的兴趣调整;这不是庙方规定的参观时长。喜欢华人庙宇建筑、装饰工艺,又愿意自己慢慢看的人,会比较适合这里。若非要有固定表演、导览或大型展馆才觉得值得,可能就不是这趟行程最优先的一站。 穿着得体,不挡祭祀动线;要拍仪式、信众或殿内空间,先征求同意。正在拜拜的人不是旅行照片里的布景,遇到活动时,我宁愿先收起相机。 地点在美里Krokop的Jln Chong Poh:Google Maps导航:美里三清殿。我会白天前往,依入口告示和管理安排参观,不围绕未经核实的固定开放时间或票价排得太紧。从古晋出发,则把它放进美里过夜行程,不为了这一站单独赶长途来回。 离开前,再从庭院侧边回看一次。主殿的宽屋顶、小凉亭与龙纹墙放在同一段步行里,比三个互不相干的打卡点更耐看。
  • 0 Votes
    1 Posts
    10 Views
    K
    I would give Miri's San Ching Tian Temple a different kind of stop from a sunset lookout. Come for the architecture at ground level: the entrance frames an open courtyard, the main hall spreads across it, and the smaller garden spaces reward a slower look along the sides. In Krokop, this is a working place of worship within a residential neighbourhood, not a monument set apart from the city. [image: 1793422660709-3.jpg] Google Map / Lian Hua San Ching Tien Temple The temple also appears as Lian Hua San San Ching Temple. I would save the exact location before leaving central Miri, rather than rely on a photograph of a colourful gateway. There are other Chinese temples nearby, and a dramatic dragon-filled entrance is not necessarily this one. The broad orange roof and the courtyard arrangement are more useful bearings than a generic search for a Miri temple. This is a Taoist temple cared for by priests. That makes the interesting story one of a contemporary religious community, not a surviving building from the first years of the oil town. I would leave comparisons about which temple is the biggest aside. The scale is easy to appreciate without turning a place of worship into a contest. From the entrance, let the building stay whole for a moment. Then compare the repeated rooflines with the columns beneath them. Dragon decoration climbs the columns and animates the ridge, while the stairs and incense burners organise the approach to the hall. For me, looking at how those parts guide movement is more rewarding than collecting a close-up of every ornament. [image: 1793422660845-2.jpg] Google Map / Lian Hua San Ching Tien Temple The dragon relief wall gives that approach a smaller scale. Here the figures sit within one rectangular panel rather than against the sky. I would step back to read the whole composition, then look at how the bodies, clouds and curling shapes overlap. The wall is a specific reason to linger; it is not just another backdrop for an entrance photograph. Keep any active worship route clear while looking. A move toward the side of the hall changes the proportions again. Garden planting and a small pavilion sit beside the long line of columns. I would use this part of the grounds for a pause rather than expect a separate landscaped attraction. The contrast between a large ceremonial frontage and these more contained spaces is the point of walking around, wherever the day's access allows. [image: 1793422661006-5.jpg] Google Map / Lian Hua San Ching Tien Temple The temple's upkeep is part of its present story. In August 2026, an RM400,000 UNIFOR allocation was handed to its Taoist association for improvements and maintenance. An allocation is not a promise that every repair is finished or that every section will be open. I would keep the visit flexible: follow barriers and notices, and ask a caretaker before entering a prayer hall or an area affected by work. The accessible grounds can still be the focus of a worthwhile short visit without treating indoor access as an entitlement. The courtyard photograph below was posted in October 2026. It looks back toward the entrance rather than at the main hall, which is a useful reminder to turn around. Older photographs elsewhere in this article show details to look for, not a guarantee that planting, paint or access arrangements remain unchanged. [image: 1793422661109-latest.jpg] Google Map / Lian Hua San Ching Tien Temple · October 2026 photo I would allow around half an hour as a starting plan, not as an official visit length. This suits someone who enjoys temple architecture and a quiet, self-directed stop. It is less suitable if the trip only feels worthwhile with a guided performance, a guaranteed ritual or a large museum exhibition. Dress respectfully, leave space for worshippers, and ask before photographing religious activity or an interior. If a ceremony is under way, the camera can wait. Find it at Jln Chong Poh, Krokop, Miri: Lian Hua San San Ching Temple on Google Maps. I would visit in daylight and check the entrance arrangements on arrival rather than build a schedule around unverified fixed hours or admission prices. From Kuching, place it within a Miri trip; it is not a reason for a separate long-distance journey. Before leaving, I would take one final look from the side of the courtyard. The wide roof, the smaller pavilion and the relief wall make more sense together than they do as three unrelated photo stops. That is the visit I would make time for.