Skip to content

News 📰

840 Topics 842 Posts

Verified Kuching and Sarawak news with local context. Reports combine attributable sources, explain why each development matters to residents and are reviewed for factual corrections after publication.

This category can be followed from the open social web via the handle [email protected]

  • 0 Votes
    1 Posts
    24 Views
    K
    Rules for replacing overlapping public holidays are on the agenda when the Sarawak Legislative Assembly sits from October 12 to 21. The Speaker said at an October 9 pre-sitting press conference in Kuching that a Public Holidays amendment would clarify the replacement mechanism when two public holidays fall on the same day. This is a bill to be tabled, not an announcement of an additional day off. Employers and families planning their calendars still need the final provisions and any subsequent official holiday notice. The sitting will also consider the Sarawak State Library amendment. It aims to streamline governance and allow a memorial archive preserving material on notable figures, events, heritage, culture and state history. Establishing the legal basis for an archive is separate from opening a new public facility. Four bills are scheduled in all. The other two are the Supply Bill for the 2027 State Budget and supplementary supply for 2026. The Speaker described this as the final sitting of the current term; the announcement did not give an election date.
  • 0 Votes
    1 Posts
    44 Views
    K
    Budget 2027 raises the Ecological Fiscal Transfer fund to RM270 million for state-level conservation, but does not identify a separate Sarawak allocation in the announced measures. The Prime Minister and Finance Minister set out the increase in the Dewan Rakyat on October 9. The fund supports state governments in conserving natural heritage and is intended to encourage community-based economic activities and ecotourism. The RM270 million is the fund’s overall allocation, not a sum announced solely for Sarawak and Sabah. A separate RM65 million provision supports about 2,500 community rangers nationwide, including the construction and maintenance of ranger posts for patrols. It is not an announcement of 2,500 new ranger vacancies in Sarawak. Another RM15 million from palm oil industry cess collections is earmarked for environmental conservation, prioritising threatened habitats and species such as the Bornean elephant and orangutan. For Sarawak conservation groups and communities, the next useful detail will be how the national measures are translated into state projects and support on the ground; the announcement does not list a state-by-state distribution or an application timetable.
  • 0 Votes
    1 Posts
    32 Views
    K
    The Bidayuh Heritage Gallery planned for DBNA’s Kuching headquarters is about 10 to 15 per cent complete, but physical exhibition work has not started. The Dayak Bidayuh National Association says the work so far centres on documentation and identifying artefacts. Its end-2027 completion target is therefore a development timetable, not a sign that a new visitor gallery is already open. DBNA outlined the progress after a weaving programme at its headquarters on October 9. It plans to call for exhibition-work tenders in November, with the chosen contractor expected to start around May 2027. Exhibition work could then take about six months. Those dates remain the association’s planned sequence rather than completed milestones. A technical committee is gathering input from different Bidayuh communities, and DBNA is working with the Sarawak Museum Department on museum standards. Artefact owners may rent or sell items to the gallery. The collection is expected to keep growing after an initial display phase. The proposed sections cover food, traditions, beliefs and traditional knowledge. Workshop space, including for weaving, and a handicraft sales corner are also planned, linking the gallery to the people who practise and make the heritage it will display.
  • 0 Votes
    1 Posts
    30 Views
    K
    Companies at Kuching’s Sama Jaya Free Industrial Zone need a clear contact agency and a timescale for resolving service problems, the Mayor of Kuching South says. At the industrial park management committee meeting at MBKS on October 9, Dato Wee Hong Seng called for closer coordination on water supply, local infrastructure and other operating needs. He asked that each outstanding issue have an identified agency and a timeframe so companies can plan and the committee can track follow-up. MBKS handles council services, local infrastructure and surrounding areas. Matters beyond its authority go to the relevant agencies, with the Sarawak Electronic and Supporting Industries Companies Association bringing members’ concerns to the committee. The distinction matters for businesses seeking action: not every industrial service problem is within the city council’s power to resolve. Sarawak Water briefed the meeting on supply capacity, pressure, quality and arrangements during disruptions, including demand from expanding companies. The Department of Environment covered wastewater discharge, emissions and waste disposal requirements. These were planning and regulatory briefings, not an announcement of a new water outage or a finding that a particular factory had breached environmental rules.
  • 0 Votes
    1 Posts
    29 Views
    K
    Sarawak and Sabah paddy farmers are to be included in the RM300 ploughing incentive under Budget 2027. The Prime Minister and Finance Minister announced the expansion in the Dewan Rakyat on October 9, alongside a doubling of the harvesting incentive from RM50 to RM100 per hectare per season. The two measures cover different farming costs: preparing the land and harvesting the crop. The federal budget provides RM2.62 billion in overall assistance for rice farmers. The minister described support of around RM4,300 per hectare across seed, fertiliser, pesticide and ploughing subsidies, together with paddy price support. That figure is a package of support measures, not an announced single cash payment of RM4,300 to every farmer. The report does not set out an application window or the detailed eligibility and payment arrangements for the expanded ploughing incentive. Sarawak growers therefore have a new inclusion announcement, but not yet the operational details needed to establish what a particular farm can claim.
  • 0 Votes
    1 Posts
    32 Views
    K
    Nearly RM1.3 billion is allocated in Budget 2027 to upgrade 682 dilapidated schools, with Sabah and Sarawak receiving particular attention. The Prime Minister and Finance Minister announced the funding when presenting the budget in the Dewan Rakyat on October 9. The 682 figure covers the announced programme; it is not a count of schools in Sarawak alone. A separate allocation for repairs and maintenance across all types of schools will double from RM1 billion to RM2 billion. The dilapidated-school upgrade programme and wider maintenance funding should therefore not be read as the same pot or added together as a confirmed Sarawak entitlement. For families and school communities in Sarawak, the announcement sets out the scale and regional priority of the upgrade programme, but does not identify which local schools will receive work or when their projects will finish. Those school-level allocations and construction schedules will determine how the funding changes pupils’ day-to-day learning conditions.
  • 0 Votes
    1 Posts
    28 Views
    K
    Budget 2027 allocates RM3.3 billion to ongoing highway projects in Sabah and Sarawak, including the Trans-Borneo Highway and Sarawak–Sabah Link Road 1. Presenting the budget in the Dewan Rakyat on October 9, the Prime Minister and Finance Minister said the Letter of Acceptance for the Trans-Borneo Highway’s Miri section had been issued. The Limbang and Lawas sections were expected to receive theirs by the end of 2026. That separates a confirmed award step in Miri from an expected step in the other two areas. Sarawak–Sabah Link Road 1 and Sabah’s Pan Borneo Highway Phase 1B are targeted for completion by the end of 2027. The announced deadline applies to those two projects, not automatically to every Trans-Borneo Highway section. The budget also sets aside RM350 million for federal road maintenance by G1–G4 contractors in Sabah and Sarawak. Maintenance funding and the highway development allocation address different work; neither announcement means a new section is already open to traffic. For northern Sarawak road users, the next concrete milestones are the outstanding Limbang and Lawas acceptance letters and progress towards the Link Road 1 completion target. The RM3.3 billion is a combined allocation for both states, not a Sarawak-only sum.
  • 0 Votes
    1 Posts
    29 Views
    K
    The first Kuching Waterfront road closure starts on October 13, ten days before the regatta and waterfront festival begin. Kuching district police say the road from Jalan Gambier to Jalan Main Bazaar will close from 8am on October 13 until midnight on November 4 for tent assembly and dismantling. The traffic restriction therefore lasts beyond the October 23–November 1 festival period and affects trips through the area even on non-event days. Additional closures for the October 23 opening ceremonies run from 7am to 6pm. They cover Lebuh Wayang to Jalan Main Bazaar, Lebuh Temple to Lebuh Wayang, the St Mary traffic-light junction towards Lebuh Wayang, and the Jalan Pearl junction towards Jalan Wawasan. On October 31, a separate 6pm–11pm closure for Festival Gendang covers the Lebuh Java junction and routes from Jalan Market to Jalan Gambier, Jalan Courthouse to Jalan Main Bazaar, Jalan Gambier to Jalan Main Bazaar, and Jalan Barrack to Jalan Courthouse. These are timed restrictions, not a notice that every listed road closes for the entire three-week period. Police advise drivers to use alternative routes and not park along roadsides. For access enquiries, the Kuching District Traffic Investigation and Enforcement Division can be reached at 082-259900.
  • 0 Votes
    1 Posts
    42 Views
    K
    Sarawak’s contribution to a new African swine fever research partnership will centre on virus data and local veterinary experience, rather than an announced farm treatment or finished vaccine. The Sarawak Infectious Disease Centre (SIDC) said on October 8 that it is joining a £3.4 million project led by the University of Sheffield. The partnership also includes the University of Liverpool and Thailand’s National Center for Genetic Engineering and Biotechnology, with SIDC working alongside Sarawak’s Veterinary Services Department. The researchers aim to understand the virus’s genetic diversity, evolution and spread. Whole-genome sequencing is intended to help build SIDC’s role as a regional genomic reference centre and produce evidence useful to farmers and veterinary authorities. UK Research and Innovation’s October 7 funding announcement independently lists the Sheffield-led African swine fever project among 18 new research and innovation projects. The £3.4 million figure is the partnership’s reported project grant, not an allocation confirmed wholly for SIDC. For Sarawak’s pig-farming sector, the local link is participation in generating and interpreting evidence about the virus. The announcement sets out research goals; it does not establish that a new vaccine, treatment or control service is ready for farmers to use.
  • 0 Votes
    1 Posts
    25 Views
    K
    Sarawak’s fourth cloud-seeding operation of 2026 runs from October 8 to 10, but the programme does not put every target dam on the same flight schedule. The Sarawak Public Communication Unit said the first day focused on Zone A: Bakun and Murum in Belaga, and Sika and Assyakirin in the Bintulu area. The operation is intended to support rainfall over dam catchments. Bengoh, near Kuching, and Batang Ai fall under Zone B. Flights there were planned for reconnaissance first, with subsequent cloud-seeding decisions taking account of the survey findings. The initial sequencing reflects concern that seeding drift could cross into Kalimantan’s airspace. For Kuching readers, Bengoh’s inclusion identifies a nearby target catchment; it is not confirmation that seeding there has already been completed. The October 8–10 operation window also should not be read as a promise of rain at a particular neighbourhood or time. This is a separate operation from the earlier September programme. Its immediate focus is the dam catchments, while the useful follow-up will be where seeding actually takes place and what rainfall and reservoir-level changes are subsequently recorded.
  • 0 Votes
    1 Posts
    33 Views
    K
    Miri Airport’s planned expansion is being shaped around two goals: handling more passengers and giving the terminal a recognisably local identity. Sarawak Transport Minister Dato Sri Lee Kim Shin said the RM445 million project, approved in April, is expected to raise annual passenger-handling capacity from about two million to four million. That is a target for the upgraded airport, not its current operating capacity. At a design engagement in Miri on October 8, Lee called for the interior to reflect the art and craftsmanship of the Orang Ulu community, including the heritage of Miri, Baram and the Kelabit Highlands. He stressed that cultural elements must be represented accurately and respectfully, while keeping the terminal safe, accessible and efficient. The October 7–9 engagement brings together the federal Public Works Department project team, cultural associations, artists and local craftspeople to gather views on the proposed interior concept. Local input is therefore being sought while the design is taking shape, rather than simply selecting decorations for a finished terminal. For travellers using northern Sarawak’s air gateway, the capacity figure concerns the airport’s ability to handle passengers. It does not establish new airline routes or additional flight frequencies; those are separate from this terminal-design consultation.
  • 0 Votes
    1 Posts
    47 Views
    K
    An 11-member delegation from Lahore's urban authorities and UNICEF Pakistan visited Kuching South City Council on October 8 to examine how children's views can feed into city planning. The exchange at MBKS headquarters included discussions with members of the Kuching South Child Council, not just a meeting between officials. Six delegates came from the Lahore Development Authority, two from other Lahore urban authorities and three from UNICEF Pakistan. Their study visit looked at the governance arrangements behind child-friendly planning and how those arrangements translate into public spaces, community facilities and participation. MBKS described school safety audits, road safety campaigns and peer-led school engagement among its existing activities. These give children opportunities to identify everyday problems and propose improvements, while the Child Council provides a structured place for their views to enter municipal discussions. The council also stressed that it works with other government agencies and community partners because not every issue affecting children falls within a local authority's remit. The visit was an exchange of planning experience; the October 8 announcement did not launch a new enrolment scheme or commit funding to specific crossings, parks or facilities.
  • 0 Votes
    1 Posts
    40 Views
    K
    Kuching South City Council's composting education and recycling programmes were among the initiatives recognised at the Green and Geopark Excellence Awards 2026 on October 8. MBKS received six awards covering leadership, environmental education, technology, community recycling, food security and infrastructure. For residents, the programmes behind the awards are more useful than the trophy count. The council's Takakura composting education teaches people to turn food waste into compost for plants. iBuyBack uses digital technology to support recycling, while Bank Sampah focuses on community participation in recovering recyclable materials. The other recognised initiatives were Kuching Farmer Market, which supports local producers and access to food, and the ESG Smart Pole for green public infrastructure. A separate leadership award completed the six. The October 8 council release described existing initiatives; it did not set out a new household collection service, participation schedule or quantified waste-reduction result. The awards recognise the council's work, but should not be read as a measured claim that every neighbourhood has the same services or environmental outcomes.
  • 0 Votes
    1 Posts
    37 Views
    K
    Western Sarawak enters the monsoon transition period from October 9, with MetMalaysia forecasting a greater likelihood of short spells of heavy rain, thunderstorms and strong winds, especially in the afternoon and early evening. The phase is expected to last until the end of October. For Kuching and nearby communities, the concern is the intensity of individual storms rather than rain lasting all day. MetMalaysia's October 6 statement said light winds from varying directions could encourage thunderstorm clouds, with possible flash floods, sudden river surges, fallen trees and damage to less sturdy structures. This is a forecast for the transition period, not a district-specific thunderstorm warning for every afternoon. Anyone timing an outdoor journey should check the latest MetMalaysia forecast and warnings through myCuaca or the department's official channels, rather than treating the October 9 start date as a fixed storm timetable. The weather hotline is 1-300-22-1638. The transition marks the end of the Southwest Monsoon, which began on May 14. MetMalaysia also expected changing wind directions to gradually reduce the effects of cross-border haze; that does not establish that local air quality has already improved.
  • 0 Votes
    1 Posts
    27 Views
    K
    Japanese company HighChem is considering Sarawak for a pilot involving technology to turn carbon dioxide into paraxylene, a feedstock used to make polyester. The proposal is an additional route being explored for the state's petrochemical industry, not an announced operating plant. Sarawak's Deputy Minister for Energy and Environmental Sustainability outlined the idea at the ASIA-TECH forum in Bangkok on October 7. He said the state's downstream plans would depend on technical feasibility, competitive production costs, market demand and cooperation between industry players. The location distinction matters: Sarawak was identified for the proposed carbon-dioxide pilot, but a specific site was not given. Bintulu Petrochemical Industrial Park was named for a separate proposed syngas-to-ethylene glycol plant covered by a HighChem–Sarawak Petchem memorandum of understanding. The two proposals should not be treated as the same plant. For Sarawak's industrial suppliers and workers, the next useful detail is whether the pilot gains a defined site and implementation plan. The October 8 report did not announce a start date, production capacity or investment amount for this particular pilot. It also did not establish that the process is already commercially viable in Sarawak.
  • 0 Votes
    1 Posts
    25 Views
    K
    The Batang Paloh Bridge is scheduled to open to traffic on October 30, giving Bruit Island and Tanjung Manis a new road crossing along Sarawak's coastal corridor. The announcement follows the joining of the bridge's final structural sections on October 8; it is not an announcement that motorists can use it today. JKR Sarawak said the 1.7-kilometre bridge would provide an alternative connection between Mukah, Sibu and Sarikei, complementing the Pan Borneo Highway. The project also includes about 4.6 kilometres of connecting roads on the island and Tanjung Manis sides. For communities that rely on the ferry, the change is a direct road connection rather than another sailing option. JKR expects it to reduce reliance on ferry services and improve access to schools, healthcare and government offices. Those are expected benefits after opening, not measured travel-time results from an operating bridge. The project has a reported contract value of RM298.98 million. The October 8 stitching ceremony marked the completion of a continuous structural crossing over Batang Paloh. Travellers planning a coastal journey should keep the announced October 30 opening separate from this construction milestone; the report did not specify a first-day opening hour.
  • 0 Votes
    1 Posts
    30 Views
    K
    Sarawak's electoral-boundary review received 126 objections and seven submissions supporting the proposed recommendations during the September exhibition. The Election Commission will now examine all 133 representations at a special meeting before determining the local-inquiry process. The EC set out that next stage in an October 8 statement, following the exhibition from September 1 to 30. Particular attention will go to representations that meet the requirements for consideration at a local inquiry. Submitting an objection is not the same as having it accepted for an inquiry. Eligible parties are to receive attendance notices at least two weeks before proceedings, but the statement did not announce an inquiry date or say that all 126 objections qualify. For Kuching and other Sarawak voters, this is a procedural update rather than confirmation of new constituency boundaries. The review runs within a two-year period beginning September 1, 2026, and is to conclude with a final report submitted to the Prime Minister. The special meeting and notices are the next steps to follow; final boundaries were not announced in this update.
  • 0 Votes
    1 Posts
    31 Views
    K
    SoftBank, Grab and PETROS have signed a framework agreement to explore an AI and digital-infrastructure platform in Sarawak. The next task is to develop a roadmap for a phased project, not to open an already-built facility. In a statement reported on October 8, the three companies said they would assess opportunities in AI computing and services, advanced technology, robotics, and local workforce and community development. SoftBank would contribute its technology and AI ecosystem, Grab its regional digital networks and applied AI capabilities, and PETROS its energy and infrastructure experience. The agreement is an initial step. The announcement did not give an investment amount, a construction timetable, a specific project site or an opening date. The October 8 document exchange at Satria Pertiwi Complex in Kuching should not be mistaken for the location of the proposed platform. For Sarawak businesses and workers, the useful distinction is between the areas the partners want to explore and projects actually committed to delivery. A more definite picture will depend on the roadmap and scope they develop; no procurement opportunity, recruitment programme or guaranteed job total was announced.
  • 0 Votes
    1 Posts
    30 Views
    K
    A vehicle owner unable to reach a JPJ counter for health reasons received a home visit in Sarikei for the thumbprint verification needed for an ownership transfer. Two officers from JPJ Sarikei's Vehicle Licensing Division carried out the check on October 7, following a request from the registered owner. JPJ Sarawak described the visit in a statement reported by TVS on October 8 and said it would continue expanding mobile-thumbprint services. The service brings the identity check to the owner; it does not remove the ownership-transfer requirements. That distinction matters for families helping someone who cannot readily travel to a counter. The Sarikei case gives those families a specific service to ask JPJ about before arranging a trip. It is not a promise that every request will qualify: the announcement did not set out statewide coverage, application steps, fees or waiting times. Arrangements for an individual owner still need to be confirmed with JPJ.
  • 0 Votes
    1 Posts
    48 Views
    K
    Kuching North has completed a five-year Low Carbon Masterplan with Universiti Malaysia Sarawak (Unimas), giving DBKU a framework for its next phase of emissions-reduction work. The detailed programme will be unveiled on October 24. Mayor of Kuching North Hilmy Othman announced the completed study at an October 8 press conference at Lebuh Java. He said the plan would support the city's 2030 targets and be launched during the Sarawak Urban Forum 2.0. A completed plan is not the same as achieved emissions cuts. Hilmy described net-zero or zero emissions as the longer-term direction, rather than announcing that Kuching North had reached it. For households and businesses, the October 24 disclosure is the next useful milestone: it should show how the planning framework translates into measures and implementation. The announcement did not specify new household obligations, charges, a programme budget or a date for reaching net zero.