Skip to content
  • 0 Votes
    1 Posts
    9 Views
    K
    砂拉越总理阿邦佐哈里(Abang Johari Tun Openg)表示,砂政府正探索与俄罗斯在火箭及卫星发射方面合作的可能性。 马新社报道,俄罗斯驻马大使Naiyl M. Latypov上周拜会时提出有关构想。砂拉越靠近赤道,是报道提及的地理条件;目前未宣布发射场地点、签署协议或工程时间表。 总理周日在古晋锡克庙扩建大楼启用仪式上说,砂拉越需要更多工程师,并愿意探讨合作,培养更多相关专业人才。他也提到,面对国际社会对砂拉越日益增长的兴趣,州政府须制定有效政策,并确保发展计划清晰。报道也提及,俄罗斯此前表达了讨论多个领域合作的意愿,包括航空航天、能源、农业、造船与教育;这不代表各领域已有敲定项目。
  • 0 Votes
    1 Posts
    9 Views
    K
    Sarawak is exploring possible cooperation with Russia on rocket and satellite launches, Premier Abang Johari Tun Openg said in Kuching on Sunday. The proposal was raised by Russian ambassador Naiyl M. Latypov during a courtesy call last week, the Premier said, according to Bernama. Sarawak's location near the Equator was cited in the report. Speaking at the opening of the Gurdwara Sahib Kuching extension, Abang Johari said Sarawak needed more engineers and was prepared to explore cooperation to build its pool of professionals. The report did not announce a launch site, signed agreement or project timetable.
  • 0 Votes
    1 Posts
    9 Views
    K
    古晋北部供水储备将随着马当三座新蓄水池建成而增加。砂拉越公用事业及电讯部长Julaihi Narawi表示,三池合计容量为7500万公升。 其中两座中层蓄水池各可储水3300万公升,工程进度达64.5%;另一座高层蓄水池容量900万公升,进度为31%。部长周日巡视工地后指出,工程也包括现有加压泵站提升及铺设水管。 计划服务范围包括Petra Jaya、Samariang、Bako、Santubong、Rambungan、Sampadi、Stoh、FAC Matang及Samajaya部分地区。有关报道没有提供竣工日期。
  • 0 Votes
    1 Posts
    8 Views
    K
    Three reservoirs being built in Matang will add a combined 75 million litres of treated-water storage for northern Kuching, according to Sarawak Utility and Telecommunication Minister Julaihi Narawi. The areas intended to benefit include Petra Jaya, Samariang, Bako and Santubong, as well as Rambungan, Sampadi, Stoh, FAC Matang and parts of Samajaya. After visiting the site on Sunday, Julaihi said the two intermediate-level reservoirs, each designed to hold 33 million litres, had reached 64.5% physical progress. The nine-million-litre high-level reservoir was 31% complete. The project also covers pump-station upgrades and pipelines; no completion date was given in his reported remarks.
  • 0 Votes
    1 Posts
    11 Views
    K
    加帛Nanga Melipis渡轮项目预计今年底可投入服务,渡轮可载24辆车。看守砂总理署副部长Jefferson Jamit Unyat表示,这项2130万令吉工程完成后,将方便民众横渡拉让江,并改善通往Sungai Melipis沿岸长屋的交通。 他周四巡视位于Jalan Kapit-Song的Nanga Sebatu工程地点后,发布项目进展。工程包括河两岸的渡轮停靠设施,以及Nanga Melipis和Nanga Sebatu Rumah Robert的混凝土斜坡。 计划也设有防撞设施、候船区及厕所。工程去年11月举行奠基礼;目前公布的是年底投入服务的预期,并非渡轮已经开航,也尚无确切首航日期。
  • 0 Votes
    1 Posts
    12 Views
    K
    A ferry capable of carrying 24 cars is expected to be ready for service at Nanga Melipis by the end of this year, according to caretaker deputy minister Jefferson Jamit Unyat. The RM21.3 million project is intended to improve crossings of the Rejang River and access to longhouses along Sungai Melipis. Jamit's update followed a Thursday inspection at Nanga Sebatu along Jalan Kapit-Song. The project includes landing facilities on both sides of the river, with concrete ramps at Nanga Melipis and Rumah Robert in Nanga Sebatu. The works also include protective fenders, a waiting area and a toilet. The ferry has not been announced as operating yet; the year-end date remains an expected target rather than a confirmed first sailing. The project held its groundbreaking ceremony in November last year.
  • 0 Votes
    1 Posts
    9 Views
    K
    砂拉越计划资助本地学生报读砂拉越大学(UNIMAS)医科,名额增至80个。砂总理阿邦佐哈里(Abang Johari Tun Openg)说,其中40个为原有名额,另外40个是在与大学商讨后增加,预计从下一次招生开始提供。 他周五在古晋出席砂总理特别奖及砂教育奖颁奖礼时表示,费用将由砂拉越基金会承担;参加这项州资助计划的学生无需通过UPU系统申请。 总理说,砂拉越需要在本地培养更多医生。另一方面,诗巫砂拉越科技大学(UTS)也正为设立医学院作准备,包括招聘教学人员,相关准备工作可能需约两年。 报道没有列出新增UNIMAS名额的具体申请日期或资格细则;80个名额也不是指全部新增。
  • 0 Votes
    1 Posts
    9 Views
    K
    Sarawak plans to fund 80 medical places for Sarawakian students at Universiti Malaysia Sarawak (UNIMAS), including 40 additional places expected from the next intake, Premier Abang Johari Tun Openg said on Friday. The total combines an existing allocation of 40 with the extra places discussed with the university. According to the Premier, Yayasan Sarawak will bear the costs and students in the state-sponsored programme will not need to apply through UPU. The announcement was made at the Sarawak Premier Special Award and Sarawak Education Award ceremony in Kuching. Abang Johari said the state needed to train more doctors locally. He also said preparations were under way for a proposed medical faculty at Universiti Teknologi Sarawak in Sibu, including recruitment of teaching staff, which could take around two years. Details of eligibility and the application process for the UNIMAS places were not provided in the report.
  • 0 Votes
    1 Posts
    9 Views
    K
    使用Pay & Go泊车时若发现半小时内被重复收费,可向营运商提出申诉。古晋南市市长黄鸿圣(Wee Hong Seng)表示,经核实属不准确的重复扣费将获退款,不会被罚款。 黄鸿圣在周六直播中说,营运商会依据系统拍摄的照片及记录核查投诉。他也提醒驾驶人士,泊车费与罚单是两回事:前者由营运商系统处理,罚单则属于古晋南市市政局(MBKS)执法范围。 他说,指定公共泊车位不论是否有编号,停放车辆都须缴费。民众遇到Pay & Go问题,也可联系他提供的010-6601919寻求跟进。 至于现有泊车费率,黄鸿圣表示市政局正与营运商沟通,希望维持收费、避免涨价。
  • 0 Votes
    1 Posts
    9 Views
    K
    Pay & Go users who believe they have been charged twice for parking should report the error to the operator and seek a refund, Kuching South Mayor Wee Hong Seng said. In his Saturday live session, Wee said the operator would check a complaint against photographs and data captured by the system. He said inaccurate duplicate charges within a half-hour period would be refunded without penalty. The mayor also drew a distinction between parking fees, which are handled through the operator's system, and compounds enforced by Kuching South City Council (MBKS). Motorists remain responsible for paying in designated public bays, whether or not a bay is numbered, he said. Wee said people with Pay & Go problems could also contact him on 010-6601919 for help following up. He said MBKS was discussing the current rates with the operator to avoid an increase.
  • 0 Votes
    1 Posts
    10 Views
    K
    古晋Saujana大厦预料将在周边重建计划下拆除。砂拉越总理阿邦佐哈里(Abang Johari Tun Openg)周日在Gurdwara Sahib Kuching扩建大楼启用仪式上提到这项计划,但没有在DayakDaily报道引述的讲话中公布拆楼日期。 该大厦位于古晋锡克庙对面。总理表示,未来周边将发展现代化建筑,范围朝Brooke Dockyard方向延伸;规划中的ART中央车站则设在锡克庙前方。 中央车站名为Hikmah Exchange,正于旧Padang Pasir停车场地点发展,预计衔接红线、蓝线及绿线。现阶段提到的是未来发展安排,并非宣布Saujana大厦拆除工程已经展开。
  • 0 Votes
    1 Posts
    8 Views
    K
    Kuching's Saujana Building is expected to be demolished as part of a redevelopment of the area opposite Gurdwara Sahib Kuching, Sarawak Premier Abang Johari Tun Openg said on Sunday. Speaking at the opening of the gurdwara's extension, he said new buildings were planned around the area towards Brooke Dockyard. The proposed ART central station would stand in front of the gurdwara. The station, known as Hikmah Exchange, is being developed at the former Padang Pasir car park and is intended to connect the Red, Blue and Green lines. The Premier did not give a demolition date in his remarks reported by DayakDaily. The redevelopment is a plan, not an announcement that work on the Saujana site has begun.
  • 0 Votes
    1 Posts
    18 Views
    K
    电竞迷11月中旬可以留意古晋砂拉越体育村:砂拉越电竞博览会SAREX26定于11月13日至15日举行,赛事总奖金为5万令吉。 《婆罗洲邮报》报道,主办方目标吸引800名参赛者,目前已有600人报名;800人仍是目标,并非最终参赛人数。 比赛分为六个组别,涵盖PUBG Mobile、Mobile Legends: Bang Bang男子及女子组、赛车模拟、Tekken 8和eFootball。现场除了比赛,也安排展览、论坛及餐饮摊位。 对想了解赛事幕后运作的人来说,活动还计划举办一场目标100人参与的工作坊,内容包括比赛管理、技术需求、转播和活动筹办。报道未列明入场安排或报名截止日期,有意参加者可先向主办方确认最新详情。
  • SAREX26 esports expo targets 800 competitors

    News 📰 sarawak esports gaming
    1
    0 Votes
    1 Posts
    25 Views
    K
    Sarawak eSports Expo 2026 is set to bring six competition categories to the Sarawak Sports Village in Kuching from Nov 13 to 15, with RM50,000 in total prize money. The Borneo Post reported that 600 participants had already registered, while organisers are aiming for 800. That target is not the final number of entrants. The programme covers PUBG Mobile, men's and women's Mobile Legends: Bang Bang, racing simulation, Tekken 8 and eFootball. Beyond the tournaments, the three-day expo is expected to include exhibitions, forums and food and beverage kiosks. A workshop aimed at 100 participants will cover the practical side of staging esports events, from technical requirements and competition administration to broadcasting. The report did not specify admission arrangements or registration deadlines, so prospective visitors and players will need to check the organisers' latest details before making plans.
  • 0 Votes
    1 Posts
    12 Views
    K
    古晋拟建家具工业园,目前仍在规划阶段;砂副总理Awang Tengah Ali Hasan说,已有15家公司表达投资兴趣。 《砂拉越论坛报》报道,这项获第13大马计划批准的项目,旨在推动高附加值的木材下游制造业。不过,公司表达兴趣并不等于已落实投资或开始营运。 Awang Tengah指出,砂木材业面对全球市场不确定、经营成本上升,以及环境合规要求日趋严格等挑战。他认为业者需要提高生产力,并发展价值较高的家具与工程木材产品。 报道没有交代工业园的具体地点或开放日期,项目目前也尚未实施。 副总理是在砂木材工业发展机构的退休人员表扬及卓越服务颁奖活动上谈及此事。他呼吁业者采用适当技术,提升生产效率与市场竞争力。
  • 0 Votes
    1 Posts
    14 Views
    K
    Fifteen companies have expressed interest in a proposed furniture industrial park in Kuching, but the project has not yet been implemented, Deputy Premier Awang Tengah Ali Hasan says. Sarawak Tribune reported that the project was approved under the 13th Malaysia Plan and is intended to support higher-value downstream timber manufacturing. The expressions of interest do not mean the companies have started operations or committed completed investments. Awang Tengah said timber businesses face rising operating costs, uncertain global markets and stricter environmental requirements. The report did not give an opening date or a specific site for the proposed park.
  • 0 Votes
    1 Posts
    12 Views
    K
    古晋北市局(DBKU)表示,关键商业执照的审批时间已从150天缩短至32小时,这项改革获得全国白金奖。 DayakDaily报道,北市局另一项单一通道(Single Crossing)准证改革,也将审批流程从14天缩短至16小时,并获颁金奖。颁奖是在10月28日至29日于雪兰莪举行的全国减少官僚繁文缛节改革会议上进行。 上述数字只针对北市局提及的两项流程,不能视为所有执照和准证都可在相同时间获批。报道没有列出适用条件,也没有说明每宗申请是否都能达到有关时限;申请人仍须向北市局确认具体要求。 根据北市局的说明,两项奖项由马来西亚生产力机构颁发,表扬简化程序和加快审批的工作。北市局表示将继续改善公共服务。
  • 0 Votes
    1 Posts
    15 Views
    K
    Kuching North City Hall says it has reduced the approval period for critical business licences from 150 days to 32 hours, an initiative recognised with a national Platinum award. DayakDaily reported that DBKU also received a Gold award for cutting the approval process for Single Crossing permits from 14 days to 16 hours. The recognition came at the National Conference on Bureaucratic Red Tape Reform in Selangor on October 28 and 29. The figures refer to the specific processes identified by DBKU, not every licence or permit it handles. The report did not specify eligibility conditions or whether the stated times apply to every application.
  • 0 Votes
    1 Posts
    14 Views
    K
    从泛婆罗洲大道路口通往斯里阿曼的道路,计划建设约9公里双车道,工程获批准拨款3亿3400万令吉。 砂总理阿邦佐哈里(Abang Johari Tun Openg)10月31日在斯里阿曼表示,现有入城道路较窄,随着车流增加已日显不足。DayakDaily报道,他预计工程需时三至四年,目标在2030年建成改善后的道路网络。 报道没有交代工程开工日期,驾驶人士目前仍须使用现有路线。总理也指出,砂政府目前处于看守状态,不能批准新项目;有关道路应视为已公布的计划,而非已经完工的设施。 根据报道,这条新双车道将与其他交通项目相配合,包括Batang Lupar二桥、Lingga大桥及第二干道,改善斯里阿曼与周边地区的连接。各工程的进度和启用时间仍须分别确认。
  • 0 Votes
    1 Posts
    11 Views
    K
    A roughly 9km dual carriageway is planned between the Pan Borneo Highway junction and Sri Aman, with RM334 million approved for the project, according to Premier Abang Johari Tun Openg. DayakDaily reported that the existing road into town is narrow for growing traffic. The Premier said construction was expected to take three to four years, with the improved network targeted for 2030. He was speaking in Sri Aman on October 31. The project remains planned rather than completed, and the report did not state a construction start date. The Premier also noted that the state government is currently in a caretaker capacity and cannot approve new projects.