<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[Padawan council urged to fix unfinished Lorong Sungai Tapang 4 road works]]></title><description><![CDATA[<p dir="auto"><strong>A resurfacing job along Lorong Sungai Tapang 4 in Padawan has been flagged for follow-up after one property entrance was left unfinished.</strong></p>
<p dir="auto">A local constituency statement said the road level outside the property had been raised by at least half a foot, while the section leading to the driveway was left with raw, untarred stones. The unfinished entrance has made it harder for the homeowner to get in and out.</p>
<p dir="auto">The Padawan Municipal Council and the contractor were urged to inspect the spot and complete the resurfacing up to the driveway. The report does not say when the rectification will be done or whether the council has responded.</p>
<p dir="auto">The complaint concerns one section of a wider road job, but it points to a practical test for neighbourhood upgrades: the work should leave affected entrances usable, not just the road surface.</p>
]]></description><link>https://kuchinghub.com/topic/1574/padawan-council-urged-to-fix-unfinished-lorong-sungai-tapang-4-road-works</link><generator>RSS for Node</generator><lastBuildDate>Thu, 29 Oct 2026 22:13:41 GMT</lastBuildDate><atom:link href="https://kuchinghub.com/topic/1574.rss" rel="self" type="application/rss+xml"/><pubDate>Tue, 22 Sep 2026 01:10:36 GMT</pubDate><ttl>60</ttl></channel></rss>